Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jul 12, 2022     Left side engine probe wires - (3 hours)       Category: Engine
Worked on routing the left side engine probe wires and spark plug wires. Left them fairly loose so as to make adjustments later. Installed and torqued the ElectroAir spark lugs on the lower right side. Couldn't torque the spark plug wires since I didn't have the correct size crows foot. Ordered a 7/8” one off Amazon. Lots of extra spark plug wire length from the slick mag. Not sure how I'm going to address that.

Also reinstalled the cowl side hinge pin guides in the fuselage with the correct size Adel clamps (-3G). Need to trim the fuselage ends and proseal the cowling ends.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.